Resolving the authority
Everything starts with a question most tools skip: which building department actually governs this parcel? The city printed on an envelope is a mail-routing label assigned by the postal service. It frequently is not the permitting authority.
We geocode the address to a coordinate and place that point inside real jurisdiction boundaries, then walk from the narrowest containing body outward until we reach one that issues building permits. Census Designated Places are discarded — they look like cities in the data and have no government. Where a town defers to its county, we follow that chain and name the office at the end of it.
Roughly half of US general-purpose local governments do not run their own building department. When the postal city and the governing authority differ, we say so on the face of the report rather than quietly resolving it.
The four verdicts
A verdict says what the code requires at this address. There are exactly four, and a verdict is recorded independently of how well we can back it.
The four evidence tiers
A tier says how well a finding is backed. It is recorded separately from the verdict, which means a “Not Required” can rest on stronger evidence than a “Required.” Both appear on every finding.
How often we re-check
Different layers move at different speeds, so they are re-verified on different schedules.
| Layer | Source | Cadence |
|---|---|---|
| Jurisdiction boundaries | Census TIGER/Line | Annual, on release |
| Permitting authority | Census permit-issuing office list, reconciled by hand | Annual |
| Adopted code editions | Adoption records, confirmed against the ordinance | Quarterly |
| Local amendments | Jurisdiction-published ordinances | Monthly change detection |
| Fee schedules | Adopted fee resolutions | Annual, and on change |
| Department contacts | Direct confirmation | Semiannual |
| After a significant storm | Affected jurisdictions | Pushed to the front of the queue within 72 hours |
Every finding prints the date its record was last verified. If that date looks old to you, it should — and the fix is to tell us, which moves that jurisdiction up the queue.
What we don't know
Publishing the gaps is part of the method. These are the current ones:
- Design wind speed and ground snow load. There is no licensed programmatic source for ASCE 7 values. Where a requirement depends on one, we say the value is not available and link the authoritative tool rather than printing a number we cannot stand behind.
- Parcel-specific conditions. Existing layer count, roof area, structural condition and exposure category are properties of the building, not the jurisdiction. We report them only where we hold a verified record.
- Coverage gaps. Some jurisdictions have no adoption record on file yet. We list them without a page rather than publishing one that cannot answer the question. Requesting a gap is how it gets filled.
- Jurisdictions with no code enforcement. Some authorities enforce no building code at all. That is a real, reportable answer and we document it explicitly — not as missing data.
We assert provenance, not correctness. Every finding tells you where it came from and when it was checked. None of them claims to be right. Confirm with the authority having jurisdiction before permitting or filing a claim.
Challenging a finding
If you believe a finding is wrong, log a challenge from the report. It is recorded against the jurisdiction record and never alters the issued report — a report cited in a claim has to stay exactly as it was issued.
If we were wrong, we issue a corrected report that supersedes the original. Both remain retrievable and independently verifiable, forever. Challenge outcomes are tracked, and that record is how our accuracy becomes something you can check rather than something we claim.